Burn and Re-Grade
This burn pit needed filled back in and graded. The best way to do this is in small lifts with lots of compaction passes to keep the settling to a minimal. Quick work with a rake and some seeding will make this area look better in no time.
Before- an 8’ deep hole filled with ash
After: Hole filled methodically to prevent any settling after the area is re-seeded
